The design center upgrades worth it are the ones you physically cannot add after closing — an extra garage bay, a room bump-out, rough-in plumbing, extra outlets, and taller ceilings — plus the high-use finishes you touch every day, like kitchen counters. Cosmetic items like paint and blinds you can almost always do cheaper later. Here’s the builder’s-eye breakdown.
We’ve built homes in Utah County since 1938, and we’ve watched thousands of buyers walk our design center process. The same regret comes up again and again: not the granite they “splurged” on, but the garage they wish they’d extended.
What’s the simplest rule for deciding which upgrades are worth it?
Spend at the design center on anything built into the structure or used daily; wait on anything purely cosmetic. Structural changes mean opening framed walls, pouring concrete, or re-engineering — work that costs far more after move-in, if it’s even possible. A coat of paint costs a weekend.
That single filter — structural and high-use now, cosmetic later — solves about 80% of the decisions you’ll face at the table.
Key takeaways
- Always upgrade now: structural options you can’t retrofit — extra garage bay, room extensions/bump-outs, taller ceilings, basement layout.
- Usually worth it now: rough-in plumbing/wiring, extra outlets and data drops, and high-use finishes like kitchen counters and primary-bath tile.
- Often skip and DIY later: paint colors, window blinds, mirrors, some light fixtures, and accent details.
- The honest test: if a contractor would have to open a wall or pour concrete to add it, do it now.
- Plan it early: structural choices are locked before framing, so decide them at the start of your build process.
Which design center upgrades are worth the money?
The upgrades worth the money fall into two groups: structural items you can never add later, and high-use finishes you’d pay more to replace down the road. Both protect resale value and daily comfort in ways a cheaper finish swap can’t.
According to the National Association of Home Builders’ What Home Buyers Really Want, 2024 Edition — a survey of more than 3,000 buyers — a laundry room (86%), garage storage (81%), and a walk-in pantry (80%) sit near the top of buyer wish lists. Those are space-and-structure features, not cosmetic ones — which tells you where lasting value lives.
What structural upgrades can you never add later?
Structural upgrades are the non-negotiables, because retrofitting them means demolition or new concrete. Decide these before framing starts, when they cost a fraction of a future remodel.
- Extra garage bay (third bay or extended depth): Utah families store snowblowers, gear, and a second vehicle here. You cannot bolt a bay onto a finished slab and roofline later.
- Room extensions and bump-outs: a deeper great room or extended primary suite changes the footing and roof — a framing-stage decision only.
- Taller ceilings (9-foot or vaulted): ceiling height is set by framing. There’s no “add later” for volume.
- Basement layout and finished space: roughed-in basement walls, a future kitchenette stub-out, and egress windows are far cheaper before drywall.
- Structural options like a morning room, extra bedroom, or covered patio: these reshape the load path and must be engineered up front.
What “behind-the-wall” upgrades are worth it now?
Behind-the-wall upgrades are cheap during framing and expensive after drywall, so they’re almost always worth it now. You’re paying for access, not just parts.
- Rough-in plumbing for a future basement bath, wet bar, or utility sink.
- Extra electrical: additional outlets, a garage EV-charger circuit, and dedicated lines for a hot tub or workshop.
- Data and low-voltage drops for wired internet, cameras, and a future home office.
- Structured wiring and ceiling-fan boxes in rooms you’ll likely add fans to.
- Gas stub-outs for a future range, fire pit, or generator.
Adding a single outlet after move-in can mean cutting drywall, fishing wire, patching, and repainting. Adding it during framing is a box and a few feet of wire.
Which finishes are worth upgrading at the design center?
High-use, hard-to-replace finishes are worth the money now because swapping them later is messy and expensive. The everyday-contact surfaces earn their upgrade.
- Kitchen countertops: quartz or granite is the surface you touch most; replacing counters later means tearing out and refitting.
- Cabinet boxes and soft-close hardware: the structure of your storage — easy to upgrade now, a full demo later.
- Primary-bath tile and shower: tile work is labor-intensive to redo.
- Flooring in main living areas: running new flooring later means moving furniture and trim throughout the house.
- Staircase railings and the kitchen island — focal points that are hard to swap once installed.
Which upgrades should you skip and DIY later?
Skip the cosmetic upgrades you can change in a weekend with a credit card and a ladder. Paying the design center premium for these rarely pays off, because the swap is easy after closing.
- Paint colors and accent walls: a $40 gallon and a Saturday beats a per-room upgrade fee.
- Window blinds and shades: easy to measure and order yourself, often for less.
- Mirrors, towel bars, and basic light fixtures in secondary rooms — simple to upgrade later.
- Pendant lights and a fancy entry fixture: a one-screw swap once you’ve lived in the space and know your style.
- Closet organizers and garage shelving: plenty of strong aftermarket systems install in an afternoon.
- Landscaping extras and accent details you can phase in over your first year.
One honest caveat: if a finish is in a hard-to-reach spot — a two-story entry fixture or a vaulted-ceiling fan — the “DIY later” math changes. When access is the cost, treat it like a behind-the-wall item and do it now.
What’s the “can’t add later” priority list?
If your budget is tight, fund the structural and access items first and let cosmetics wait. Here’s how the big categories sort out in plain terms.
| Upgrade | Worth it at the design center? | Why |
|---|---|---|
| Extra garage bay / depth | Yes — can’t add later | Requires new slab and roofline; impossible to retrofit. |
| Room extension / bump-out | Yes — can’t add later | Changes footings and roof; framing-stage only. |
| Taller / vaulted ceilings | Yes — can’t add later | Set by framing; no post-build option. |
| Rough-in plumbing & extra outlets | Yes — cheap now | You pay for wall access, not just parts. |
| Kitchen countertops | Usually yes | High daily use; messy and costly to replace later. |
| Main-area flooring | Usually yes | Whole-house job to redo after move-in. |
| Paint & accent walls | Skip — DIY later | A weekend and a gallon of paint. |
| Blinds, mirrors, basic fixtures | Skip — DIY later | Easy aftermarket swaps, often cheaper. |
| Closet & garage organizers | Skip — DIY later | Strong aftermarket kits install in an afternoon. |
Want to see how these choices come together in a real layout? Browse our Utah floor plans and our finished-home gallery for ideas, and read our guide to 14 ways to personalize your floor plan.
How does Patterson’s design center make these calls easier?
Our design center is a guided part of the build, not a pressure pitch — a designer walks you through structural deadlines first, then finishes. As a semi-custom builder with roughly a 120-day build, we lock structural options early so nothing important gets missed.
That sequencing matters. Structural and rough-in choices have a hard cutoff before framing; finishes have more runway. Knowing the order keeps your budget on the things you truly can’t change.
If you’d rather skip the choices entirely, our quick move-in homes already include popular upgrades selected by our design team — a great option when your timeline is short.
Frequently asked questions about design center upgrades
How much should I budget for design center upgrades?
There’s no single number, since it depends on your plan and community. A practical approach is to reserve most of your upgrade budget for structural and rough-in items you can’t add later, then spend what’s left on high-use finishes. Cosmetic items can wait. Talk with our team at (385) 462-0191 for plan-specific guidance.
Can I really add outlets and plumbing after closing?
You can, but it usually means cutting and patching drywall, fishing wire or pipe, and repainting — far more than the cost during framing. That’s why rough-in plumbing, extra outlets, and data drops are some of the best-value upgrades. You’re paying for open-wall access while it’s still cheap and easy to get.
Are upgraded countertops worth it, or should I replace them later?
Upgraded counters are usually worth it now. Countertops are a high-touch, everyday surface, and replacing them later means tearing out and refitting cabinets, sinks, and backsplash. Doing it during the build is cleaner and avoids living through a future kitchen project. It’s one finish most homeowners are glad they chose up front.
What’s the one upgrade buyers regret skipping most?
In our experience, it’s garage space — an extra bay or added depth. Utah homeowners need room for vehicles, snow gear, and storage, and a garage cannot be expanded after the slab and roof are built. Room extensions and taller ceilings draw similar regret. Cosmetic choices rarely cause regret, because they’re easy to change later.
When do I have to make structural decisions?
Structural and rough-in decisions are locked before framing begins, early in the build. Finishes like counters, tile, and flooring come a bit later in the schedule. Because structural options have the hardest deadline and the biggest cost to add afterward, our designers cover them first. See the full sequence on our process page.
Ready to plan your upgrades the smart way?
Start by exploring our floor plans to find a layout you love, then let our design team help you prioritize the structural and high-use upgrades that matter most. We’ll keep your budget pointed at the things you can’t add later.
Browse our Utah floor plans or call our team at (385) 462-0191 — we’ll help you build a home that fits your life from the studs out.